ms consultants performed the design for the rehabilitation of 10 mainline bridges on the Indiana Toll Road from milepost 119.08 to milepost 147.49 in eastern LaGrange and western Steuben Counties. The toll road runs east and west across the entire northern portion on the state. The bridges included crossings over a river, state highways, interchange ramps and a railroad.
Engineering services consisted of field survey, preparing needs reports, preparing contract plans and special provisions, preparing construction cost estimates and preparing environmental documentation.